top of page
Profile
Join date: Apr 26, 2019
Posts (27)
Mar 10, 2026 ∙ 3 min
Why Cast-Iron Segments Remain a Practical Choice for Tunnel Eyes and Cross-Passages
In underground construction, standard tunnel rings are only part of the picture. Some of the most demanding areas on a project are tunnel eyes, cross-passages, junctions and other transition zones where geometry changes, interfaces become more complicated and ground conditions are often less forgiving. These are the areas where the lining choice matters most. The right solution can help reduce excavation size, improve stability, limit temporary works and provide dependable long-term...
121
0
4
Jan 12, 2026 ∙ 2 min
Strategic Outlook and Priorities for 2026
As global demand for large-scale infrastructure, energy, and underground construction continues to grow, DTS Equipment Ltd. enters 2026 with a clear strategic focus: scaling production capacity, strengthening engineering support, and delivering complex heavy castings with predictable quality and lead times. Building on a strong 2024–2025 project pipeline, 2026 will be a year of controlled expansion, technical refinement, and deeper collaboration with EPC contractors and design consultants...
195
0
4
Nov 28, 2025 ∙ 2 min
DTS Equipment Attends STUVA Expo 2025
DTS Equipment Ltd. participated in the STUVA Expo 2025 in Munich, one of Europe’s leading events dedicated to tunnel construction, underground engineering, and infrastructure development. The exhibition brought together design consultants, engineering companies, and contractors involved in planning and delivering major tunnelling and shaft-sinking projects across Germany and the wider European market. Our attendance focused on strengthening relationships with engineering design houses and...
153
0
9
Maxym Dyakonyuk
Admin
More actions
bottom of page
